How it works

    How to order cocopeat and coconut fiber in bulk

    From your first message to a container at your warehouse: nine steps. Scroll to follow the order from our door, over the road, across the sea and on to yours.

    1. 01STEP 01 / 09

      You contact us

      Send the product, specification, quantity and destination port through the contact form or WhatsApp. We reply within one business day.

    2. 02STEP 02 / 09

      You confirm and pay

      Once specification, price and shipping terms are agreed, you confirm the order and pay by T/T or L/C.

    3. 03STEP 03 / 09

      We prepare your product

      Your order is produced to the agreed specification and checked before loading. Lead time for one container is 14 days.

    4. 04STEP 04 / 09

      We load the container

      The goods go into a 40ft high cube container under the supervision of our export team.

    5. 05STEP 05 / 09

      The truck takes it to the port

      The loaded container travels by truck to the port of loading, with the export documents ready.

    6. 06STEP 06 / 09

      A crane lifts it onto the ship

      At the port, a crane lifts the container onto the vessel and the Bill of Lading is issued.

    7. 07STEP 07 / 09

      The ship sails to your port

      The container departs on the confirmed date and we keep you updated until it is on its way.

    8. 08STEP 08 / 09

      The container arrives

      At your port the container is unloaded and cleared through customs under your country’s import rules.

    9. 09STEP 09 / 09

      A truck delivers it to you

      A truck takes the container from the port to your warehouse. Check the goods against the Certificate of Analysis.

    Bulk orders from Indonesia

    Before you order.

    Start with the right specification. Compare our coconut fiber and cocopeat products, then send your quantity and destination port for a quotation.

    Minimum order
    1 container
    40ft high cube (HC)
    Production lead time
    14 days
    For one container; sea transit is extra
    Payment
    T/T or L/C
    Agreed in your quotation
    Review the nine order steps
    1. You contact us

      Send the product, specification, quantity and destination port through the contact form or WhatsApp. We reply within one business day.

    2. You confirm and pay

      Once specification, price and shipping terms are agreed, you confirm the order and pay by T/T or L/C.

    3. We prepare your product

      Your order is produced to the agreed specification and checked before loading. Lead time for one container is 14 days.

    4. We load the container

      The goods go into a 40ft high cube container under the supervision of our export team.

    5. The truck takes it to the port

      The loaded container travels by truck to the port of loading, with the export documents ready.

    6. A crane lifts it onto the ship

      At the port, a crane lifts the container onto the vessel and the Bill of Lading is issued.

    7. The ship sails to your port

      The container departs on the confirmed date and we keep you updated until it is on its way.

    8. The container arrives

      At your port the container is unloaded and cleared through customs under your country’s import rules.

    9. A truck delivers it to you

      A truck takes the container from the port to your warehouse. Check the goods against the Certificate of Analysis.

    Choose your product.

    Our Products
    Baled coconut coir fiber stacked in the warehouse, ready for container loading

    Coconut fiber bales

    Cleaned, dried coir for mattresses, erosion-control products and horticulture. Confirm your fiber length, moisture and impurity limits before ordering.

    Container load / MOQ
    18 metric tons
    Packing
    95–130 kg bales
    View coconut fiber specifications
    Compressed coco peat blocks packed for export

    Cocopeat blocks

    Compressed 5 kg blocks for nurseries, hydroponics and potting mixes. Choose the EC level to suit your crop and growing system.

    Container load / MOQ
    20 metric tons
    Packing
    5 kg blocks
    View cocopeat specifications

    Shipping & paperwork.

    Choose EXW, FOB or CIF. Your quotation sets out the agreed costs and responsibilities.

    EXWEx Works

    We arrange
    Goods ready at our premises.
    You arrange
    Pickup, export and import clearance, freight and insurance.

    FOBFree On Board

    We arrange
    Export clearance and loading on board the vessel.
    You arrange
    Sea freight, insurance, import clearance and local delivery.

    CIFCost, Insurance & Freight

    We arrange
    Export clearance, sea freight and minimum insurance to your port.
    You arrange
    Port unloading, import clearance and local delivery.

    Documents for your shipment

    Tell us your destination country so we can check its document requirements.

    • Certificate of Analysis (COA)
    • Certificate of Origin
    • Phytosanitary Certificate
    • Material Safety Data Sheet (MSDS)
    • Commercial Invoice & Packing List
    • Bill of Lading

    A fumigation certificate or manufacturer declaration is added where required.

    A few common questions.

    Need a different specification? Talk to our team.

    Can I test a sample first?

    Yes. We can arrange a sample for your lab. Include the specification you want to test in your inquiry.

    Does the 14-day lead time include shipping?

    No. It covers production for one container. Sea transit depends on your destination port and the shipping line.

    Who handles import customs?

    Under FOB and CIF, you or your consignee handles import clearance. We provide the shipment documents your customs broker needs.

    What if I need more than one container?

    Send your volume and target shipping date. Lead times for larger orders are agreed in the quotation.

    Let’s price your order.

    Send your product, specification, quantity and destination port.
    We reply within one business day.